Offshore compute infrastructure

The cloud
meets the sea.

A fleet of autonomous data-center vessels, operating as one resilient offshore cloud—built for the next wave of AI.

44°10′N
28°39′E
10 MW vessel unit
1.10 target PUE
CONCEPT VESSEL / REV. 01
01 / 07
Natural seawater cooling Zero freshwater use Modular deployment Fleet-level redundancy Renewable-ready power Natural seawater cooling Zero freshwater use

AI needs a new
place to live.

Data centers are running into hard physical limits: constrained grid capacity, scarce land, water-intensive cooling and multi-year approvals. Black Sea Compute moves standardized infrastructure offshore and grows it one vessel at a time.

Marine space is not free or unregulated. The opportunity is to build a repeatable, permitted platform—not to avoid regulation.

1.07 PUE

achieved by Microsoft’s experimental Project Natick module

Source ↗
0 water

freshwater consumed for cooling in the Natick subsea test

Source ↗
⅛ failures

server failure rate versus Microsoft’s land-based control group

Source ↗

One cloud.
Many vessels.

Compute, storage and network traffic are distributed across independently powered modules. Losing one vessel reduces capacity—it does not take the cloud offline.

SHORE CONTROL Grid · fiber · operations
2× DIVERSE FIBER
VESSEL ACompute + storage
VESSEL BCompute + storage
VESSEL CMaintenance mode
VESSEL DReserve capacity
↳ WORKLOADS REBALANCE AUTOMATICALLY
01

Recoverable by design

Whole vessels return to port for major maintenance and hardware refreshes.

02

Cooling by the sea

Closed internal loops reject heat through marine heat exchangers—without freshwater.

03

Failure is expected

Checkpointed jobs, replicated storage and reserve capacity absorb a vessel outage.

04

Built in shipyards

A repeatable platform replaces bespoke construction at every expansion site.

Concept unit / Gen 01

A data center
that can move.

The first commercial platform is a grid-connected, remotely operated vessel. Solar supports auxiliary loads; dense AI compute relies on contracted grid and renewable power.

IT CAPACITY5–10 MW
TARGET PUE≤ 1.12
COOLINGDirect liquid
CONNECTIVITY2× 400G+
REFRESH CYCLE3–5 years
ONBOARD CREWNone
SYSTEM CUTAWAY NOT TO SCALE
01Solar auxiliary deckControls + hotel loads
02High-density computeGPU racks + fabric
03Cooling plantClosed loop + exchangers
04Power + stabilityUPS · switchgear · ballast

Sell capacity.
Own the platform.

Start as an infrastructure operator. Let anchor customers supply the GPUs; add managed compute only after the marine platform is proven.

01

Reserved AI capacity

Dedicated modules under 5–10 year take-or-pay contracts.

CORE
02

Offshore colocation

Power, cooling, physical isolation and network for customer hardware.

CORE
03

Managed bare metal

Operated clusters for sovereign AI, simulation and media workloads.

PHASE 2
04

Platform licensing

Design, software and operating model for other coastal markets.

PHASE 3
10 MW ILLUSTRATIVE CAMPUS

Designed for infrastructure-grade returns.

Planning assumptions only—not supplier quotes or an investment offer.

Contracted utilization80%
Capacity fee€250/kW/mo
Capacity revenue€24M/yr
Target infrastructure CAPEX<€130M

Prove small.
Scale by fleet.

The company earns the right to scale at every gate.

PHASE 00–6 MO

Design & qualify

Site screening, authority consultations, customer LOIs and pressure prototype.

€1.5–2.5M
PHASE 16–24 MO

Demonstrate

Build and deploy a 100–250 kW unit in sheltered Romanian waters.

€5–8M
PHASE 224–54 MO

Commercial pilot

Operate, recover, redeploy and commission the first contracted 2 MW.

€25–40M
PHASE 354+ MO

Fleet expansion

Standardize 5–10 MW vessels and establish an offshore availability zone.

Project finance

Hard tech.
Real constraints.

The moat is the approved, insurable operating system around the vessel.

01 Site & permits +

Maritime spatial compatibility, seabed rights, EIA, navigation safety, cable routes, grid connection, protected-area review and security coordination.

02 Marine engineering +

Naval architecture, corrosion and biofouling protection, thermal modelling, mooring, cable protection, ROV inspection and tow-to-port recovery.

03 Digital infrastructure +

Liquid-cooled compute, two independent fiber routes, encryption, checkpointing, erasure-coded storage and onshore workload replication.

04 Commercial bankability +

A 60–70% take-or-pay anchor contract, renewable PPA, classification, environmental monitoring, marine insurance and independently verified operating data.

Grounded in
what is proven.

Concept targets and financial figures remain planning assumptions until engineering studies and vendor quotations are complete.

The next availability zone

Build beyond
the shoreline.

Seeking marine engineering, energy, connectivity and anchor-customer partners for the Black Sea demonstrator.